QUANTITATIVE RESULTS

Program: 4 inch Pedestal
Supplier: DiMonte Group
Challenge: Convert outdoor pedestal from metal to plastic
Results: 18% cost reduction • Three week design and prototype delivery • New design differentiated Client in the market place and led to increased sales
Program: FiberPak Assembly
Supplier: Xten Industries
Challenge: Streamline manufacturing and assembling of outdoor plastic enclosure
Results: 12% cost reduction • Lead time reduced to 3 weeks • 4 Suppliers reduced to 1
Program: Outdoor Pedestal
Supplier: Dutchland Plastics
Challenge: Lower cost and provide a reliable supplier for collection of outdoor plastic / metal pedestal assemblies
Results: 8% cost reduction • 20% on-time delivery improvement • 2 Suppliers reduced to 1
Program: Cable Assemblies
Supplier: Tech Products Group
Challenge: Reverse engineer a collection of 4 cable assemblies, reduce suppliers and lower cost
Results: 40% cost reduction • Lead time is 2 week vs. 7 weeks • 3 Suppliers reduced to 1
Program: Outdoor Port Assembly
Supplier: Tech Products Group
Challenge: Reduce suppliers, lower cost and improve delivery of a rubber, metal and die casting assembly
Results: 30% cost reduction • Lead time is 3 weeks vs. 7 weeks • 3 Suppliers reduced to 1
Program: Door Rod Assembly
Supplier: Tech Products Group
Challenge: Lower cost and provide reliable supplier on legacy metal, plastic assembly
Results: 20% cost reduction • Lead time is 1 week vs. 7 weeks