| Program: |
4 inch Pedestal |
| Supplier: |
DiMonte Group |
| Challenge: |
Convert outdoor pedestal from metal to plastic |
| Results: |
18% cost reduction • Three week design and prototype delivery • New design differentiated Client in the market place and led to increased sales |
 |
| Program: |
FiberPak Assembly |
| Supplier: |
Xten Industries |
| Challenge: |
Streamline manufacturing and assembling of outdoor plastic enclosure |
| Results: |
12% cost reduction • Lead time reduced to 3 weeks • 4 Suppliers reduced to 1 |
 |
| Program: |
Outdoor Pedestal |
| Supplier: |
Dutchland Plastics |
| Challenge: |
Lower cost and provide a reliable supplier for collection of outdoor plastic / metal pedestal assemblies |
| Results: |
8% cost reduction • 20% on-time delivery improvement • 2 Suppliers reduced to 1 |
 |
| Program: |
Cable Assemblies |
| Supplier: |
Tech Products Group |
| Challenge: |
Reverse engineer a collection of 4 cable assemblies, reduce suppliers and lower cost |
| Results: |
40% cost reduction • Lead time is 2 week vs. 7 weeks • 3 Suppliers reduced to 1 |
 |
| Program: |
Outdoor Port Assembly |
| Supplier: |
Tech Products Group |
| Challenge: |
Reduce suppliers, lower cost and improve delivery of a rubber, metal and die casting assembly |
| Results: |
30% cost reduction • Lead time is 3 weeks vs. 7 weeks • 3 Suppliers reduced to 1 |
 |
| Program: |
Door Rod Assembly |
| Supplier: |
Tech Products Group |
| Challenge: |
Lower cost and provide reliable supplier on legacy metal, plastic assembly |
| Results: |
20% cost reduction • Lead time is 1 week vs. 7 weeks |
 |